Salt Bath Furnace Transformer
Overview
A salt bath furnace transformer provides low-voltage, high-current power for heat treatment. Output ratings are matched to the bath load, process-temperature control, duty cycle and electrode connections.
Technical Specifications
Send the required capacity, input and output voltages, frequency, load duty, cooling and installation conditions. Model selection and guaranteed ratings follow the project specification.
| Model number |
Rated capacity (kVA) |
Phase number |
Rated voltage (V) |
Current (A) |
Loss (W) |
Impedance voltage (%) |
No load current (%) |
Connection group label | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
Primary voltage (V) |
Secondary (V) |
High voltage | Low voltage | Empty load | Short circuit | ||||||
| ZUDG(J)-25 | 25 | 1 | 380 |
12.5 14.8 17.4 25 29.6 34.8 |
39.6 48 56.8 79 96 114 |
1250 | 140 | 820 | 8 | 4 | Io |
| ZUSG(J)-35 | 35 | 3 | 380 |
6.69 8.37 10.45 11.6 14.5 18.1 |
24.6 30.6 38.5 42.7 53.5 66.7 |
1400 | 240 | 1100 | 6 | 6 | Y.D-α-11-12 |
| ZUSG(J)-50 | 50 | 3 | 380 |
11.7 14.7 18 20.4 25.4 31.5 |
43.3 54.5 66.6 75.9 94.5 117 |
1400 | 280 | 1550 | 7 | 5 | Y.D-y-12-11 |
| ZUDG(J)-50 | 50 | 1 | 380 |
11.2 12.7 14.6 17.3 22.4 25.4 29.2 34.6 |
44.2 63.5 76.8 102 132.5 156 173 213.6 |
2315 | 250 | 1450 | 12 | 5 | Io |
| ZUSG(J)-75 | 75 | 3 | 380 |
11.2 12.6 14.7 17.3 19.3 21.9 25.2 30 |
60 67.5 86.5 102 114 125 142 159.5 |
2190 | 350 | 2000 | 12 | 4 | Y.D-y-12-11 |
| ZUSG(J)-100 | 100 | 3 | 380 |
11.2 12.6 14.7 17.3 19.3 21.9 25.2 30 |
87.5 98.8 114.5 134.5 152 171 197.5 212.5 |
2950 | 450 | 2600 | 12 | 4 | Y.D-y-12-11 |
| ZUSG(J)-150 | 150 | 3 | 380 |
11.2 12.6 14.7 17.3 19.3 21.9 25.2 30 |
129.6 147.8 171.8 202.7 226 250 276 318 |
4460 | 650 | 3500 | 13 | 3 | Y.D-y-12-11 |
| ZUSG(J)-200 | 200 | 3 | 380 |
12.6 15 17.3 19.6 21.8 26 30 34 |
176 209 240 273 304 362 418 462 |
5500 | 820 | 4150 | 12 | 2.5 | Y.D-y-12-11 |
| ZUSJ-250 | 250 | 3 | 380 |
11.5 13.5 15 20 23.5 26 |
218 256 285 380 447 494 |
7200 | 1020 | 5100 | 14 | 2 | Y.D-y-12-11 |
* Values are reference data; project guarantees are confirmed in the technical agreement.
Packing & Delivering
Multi-layer protection and expert logistics for safe global transit.
FAQ's
Q: How Are Price And Lead Time Confirmed?
A: They are confirmed after reviewing the specification and quantity.





























