What Preparations Are Made Before The Manufacturing Of Furnace Transformers?

Preparations before the manufacturing of furnace transformers include the following:

1. Technical Design and Planning
Demand analysis and scheme formulation: Based on the load characteristics of the industrial furnace (such as smelting, quenching, etc.), the capacity, voltage class, and tap-changing method of the furnace transformer are determined. The design needs to meet key parameter requirements such as short-circuit impedance and overload capability.
Drawing and process design: Winding layout drawings are prepared, the core stacking sequence is planned, and detailed procedures such as insulation treatment and welding processes are formulated.

2. Material and Component Procurement
Selection of core materials: High-permeability silicon steel sheets are used for the core, and copper or aluminum wire is used for the windings to ensure electrical conductivity and heat resistance.
Preparation of standard components: These include bushings, tap changers, cooling devices (oil immersed types require radiators), etc., all of which must comply with industry standards.

3. Equipment Commissioning and Environmental Control
Calibration of production equipment: The accuracy of winding machines, vacuum drying ovens, test platforms, and other equipment is checked to ensure uniform coil winding and compliant insulation performance.
Workshop condition optimization: A constant temperature and humidity environment is maintained to reduce the impact of dust on insulating materials.
After the above preparations are completed, work instructions are compiled and technical briefings are organized to ensure that every step meets safety and quality standards.